Catherine McAuley Joint Use Facility
For Nicholson Construction
Consumer mains and MSB upgrade
New 600 amp 500m submains and associated undergrounds
Comms infrastructure including fibre
Electrical fit out to Joint Use Facility, including:
General light and power
Exit and emergency lighting
Distribution boards and submains
Comms
Fire detection
PA system
Hearing augmentation systems
30kW solar system
Dali lighting control system
External lighting, including driveway and car park pole lighting
200 Lux LED flood lighting to two netball courts
100 Lux LED flood lighting to two football ovals
Power requirements for irrigation system



