Catherine McAuley Joint Use Facility

For Nicholson Construction

  • Consumer mains and MSB upgrade

  • New 600 amp 500m submains and associated undergrounds

  • Comms infrastructure including fibre

  • Electrical fit out to Joint Use Facility, including:

    • General light and power

    • Exit and emergency lighting

    • Distribution boards and submains

    • Comms

    • Fire detection

    • PA system

    • Hearing augmentation systems

    • 30kW solar system

    • Dali lighting control system

  • External lighting, including driveway and car park pole lighting

  • 200 Lux LED flood lighting to two netball courts

  • 100 Lux LED flood lighting to two football ovals

  • Power requirements for irrigation system

Previous
Previous

Fernwood Bendigo

Next
Next

Porcino